Saturday, January 19, 2008

Hidden Lake Exhibition Approaching

The Hidden Lake Gardens Exhibition is fast approaching. The LCVA is looking for nature inspired art to be displayed at the Hidden Lake Gardens Visitor Center from February 22nd through April 6th. A desert reception will be held on March 15th, 1-3 pm where the public is welcome to come and visit with the artists. On March 15th all visitors are FREE.  If you are an LCVA member and you are interested in displaying your work please contact Janet Graham by January 23rd. Her email address is grahams4@tc3net.com . If you would like more information on becoming an LCVA member click here.

Monday, January 14, 2008

The Candlelight Show
















The LCVA and The Image Gallery have teamed up for a new exhibition titled "The Candlelight Show".

Candlelight artists include:
Janet Dant Graham
Gerry Church
Gregorio Perez

Dates:  January 15 - February 15, 2008

Location:  The Image Gallery, 126 South Main St., Adrian, MI

Hours:  9:30-5:30 M-F, 9:30-1 Sat

Artists Reception:  Friday, January 18th, 6-8pm




Tuesday, January 08, 2008

Bathroom Renovation

FINALLY!!!!

Myself and Chris Graham are meeting at the gallery on Tuesday, January 15th at 5:30 pm to run a water line to the bathroom sink.  If you would like to help out please stop by.  Here is a list of things that needs to be done if you want to help.

1.  The back closet needs to be cleaned out completely.  Stuff either needs to go to the basement or thrown away.  If you can do this before the 15th our work will go quicker.

2.  The front closet needs to be cleaned out completely.  I have been tearing out some drywall and have made a mess of it.  When the drywall is patched and painted we'll move the stuff back.  It can be relocated to the gallery floor since we have no exhibits in January.

3.  The walls in the gallery could use some serious sanding...not hand sanding....power sanding.  If you're interested and have a power sander then please go for it...I have one if you want to borrow it.

4.  There are two areas in the front closet that need drywall replaced....small patches approximately 14x24.  If you have any spare drywall, tape and mud we need some.  But, this must wait until after we install the water lines.

5.  When all the drywall is patched we'll need somebody to paint.  Got any spare white paint at home sitting on a shelf?  We need some.

6.  Janet will be repainting and putting in a new tile floor in the bathroom after the water lines are installed.  If you're interested in helping her with that please let her know.  grahams4@tc3net.com

7.  We wont get everything done in one night.  I'll be in and out of there a few times next week.  If you want to go on your own time.....let me or Janet know and well give you the door combination.